Work area set up beneath a house roof edge

Asbestos Eaves and Gutter Removal on the Central Coast

The flat lining under your roof edge is one of the most common places for old cement sheet. We take it down safely, with gutters and downpipes if they need to go too.

SafeWork NSW licensed · Free on-site quotes · Fixed price upfront

Central Coast Asbestos Removals removes asbestos cement eaves linings, also called soffits, plus old cement gutters and downpipes, from homes across the Central Coast. Eaves are quoted on site because the length, height and condition vary so much from house to house.

Planning new downlights, a re-roof or a paint job? Check the eaves before anyone drills or sands.

Tell us about your eaves

Send it through and we'll be in touch within 30 minutes.

Explore our services, then return to your quote

Every bit helps. Sometimes we can quote remotely, saving you time.

Sent securely. See our Privacy Policy for how we handle your details.

No obligation. We'll text you to book a time.

Your enquiry goes straight to our team. We'll be in touch about your free on-site quote for SafeWork NSW licensed asbestos removal.

How it works. Easy as.

  1. Fill out the quick form.

    As much or as little detail as you like.

  2. We'll text you within 30 minutes to say hi and get a few details.

  3. We book a site visit at a time that suits you.

    A licensed removalist checks the material and measures up, so your quote is accurate and fair.

  4. You get a written quote within 30 minutes of the visit.

    Fixed, all-inclusive price. No hidden extras.

  5. Happy with it? Say yes.

    Flexible payment options are available if cash flow's a bit tight.

  6. Removal day.

    SafeWork NSW licensed removalists take it away safely and leave your place cleaner than they found it.

  7. Done and dusted.

    Your asbestos is wrapped, transported and legally disposed of at a licensed facility, with a clearance certificate where required. One less thing to stress about.

Trace the full run, including returns and porches

Eaves are not always one simple strip along the front of a house. The lining can continue around corners, under a veranda, above an entry or along the edge of a garage. Tell us which runs are in scope and whether the work includes attached structures. A few photos from the ground can help show where the roofline changes without anyone climbing up to inspect it.

A later extension may have a different lining from the original building. Testing or a previous report for one section does not automatically identify every other section. If your roof or painting project will disturb several materials, include those locations in the assessment before work begins.

Ask whether cover strips, trims and related suspect products are included. Replacement lining, new gutters, painting and roof repairs are separate tasks unless the quote expressly includes them. The useful handover is a clear description of what has been removed and what the next trade will find, not simply an empty-looking edge.

Work at height and protect the area below

Height, ground conditions and the space beside the building affect safe access. A narrow side passage, a sloping garden, a neighbouring roof or a pool can matter as much as the length of the eaves. Let us know about those constraints before quoting so access equipment and the work boundary can be planned properly.

Do not climb onto a suspect roof or lean a ladder against a fragile lining to measure the job. We can establish the relevant dimensions during the site assessment. While work is underway, the area below also needs to stay clear of occupants, pets and other trades.

Plants, outdoor furniture, stored items and adjoining surfaces need to be considered in the protection and clean-up plan. Tell us if the run is directly over a path, gate or boundary used by other people. A well-defined exclusion area is more useful than expecting everyone to work around the removal as if it were ordinary exterior maintenance.

Coordinate the roof, gutter and replacement trades

If the eaves are part of a larger roof or gutter project, agree on the order before anyone starts stripping materials. A gutter installer, roofer or painter should know which surfaces are suspect and where the asbestos work ends. Removing a fixing or sanding an adjoining edge can disturb a product even when that trade is not replacing the lining itself.

Ask how rain protection and the next stage of building work will be managed once the old lining is removed. Those arrangements depend on the building and the agreed scope; they should not be left as an assumption that the asbestos team is also carrying out every repair.

After the removal and relevant inspection steps, keep the disposal evidence and handover records. Make sure the next contractor understands which runs were completed and whether another section was outside the quote. The replacement materials and finish can then be installed against a documented scope, rather than hiding an unresolved suspect section behind new work.

Why the eaves are often original

Roofs get replaced, but eaves often stay. Paint hides the surface, and many owners assume the linings went when the roof did. On homes built or renovated before 1990, the soffits are worth checking even if the roof is new.

Extensions complicate things. One side of a house can have cement sheet and the other a later board. We check each run, and testing confirms the material.

Gutters and downpipes

Some older homes have cement gutters and downpipes as well. They look heavier than metal and are often cracked at the joins. We assess them separately and list them clearly in the quote, so nothing is assumed.

If they are coming out, your roofer or plumber quotes the replacements. We time removal so the house is not left without drainage for long.

Doing the eaves with the roof

If the roof is cement sheet too, doing both together usually saves money. The access is shared, the sequence is simpler and one clearance covers the job. If the roof is staying, eaves can still be done on their own; we check how the panels are fixed first.

Access and garden

Eaves work happens at height, along narrow side paths and above garden beds. We plan how panels are lowered and where wrapped waste is staged. Clear cars, pot plants and outdoor furniture from the agreed area before the day.

Cracked or storm-damaged eaves

Do not break off a hanging section or sweep up fallen pieces. Keep people out from underneath and get it assessed. Bonded removal over 10m² needs at least a Class B licence, and friable material needs Class A.

Eaves guide prices (inc GST)

JobTypical price (inc GST)Guide link
Eaves and soffitsQuoted on site

Prices are a guide only and depend on size, access and condition. Your free on-site quote gives you a fixed price before any work starts.

Full guide
Cement gutters and downpipesQuoted on site

Prices are a guide only and depend on size, access and condition. Your free on-site quote gives you a fixed price before any work starts.

ClearanceQuoted on site

Prices are a guide only and depend on size, access and condition. Your free on-site quote gives you a fixed price before any work starts.

Got more than one asbestos job? Book them together on the same visit and they can share one clearance inspection instead of paying for a separate one each time. That means a fence, shed roof and eaves on the same property add up to a real saving.

All prices include GST. Every removal quote sets out removal, wrapping, transport, disposal and clearance before work starts.

Prices are a guide only and depend on size, access and condition. Your free on-site quote gives you a fixed price before any work starts.

Frequently Asked Questions

No. Many pre-1990 homes have cement sheet eaves, but some have been replaced. Testing confirms it.

Often yes. We check the fixings and connections first and explain any limits.

Some older cement gutters are. Metal and plastic ones are not. We assess them separately.

No. New linings, gutters and painting are quoted by your builder or roofer.

Accessible single-storey eaves are often done in a day. Two storeys or a combined roof job take longer.